Welcome to the LEMA School Integrated Family Accountability System Project Wiki.
Team grade information.
Team 14
50
9.875
24.88
15
5
39.25
10
24
4
182.005
Team 5
49.875
10
24.25
15
5
34
10
25
4.7
177.825
Team 13
50
10
24.38
15
5
33.5
10
25
4.5
177.38
Team 10
50
9.625
24.63
15
5
36.38
10
23
3
176.635
team 1
50
9.875
24.38
15
5
33.63
10
25
3
175.885
Team 7
49.75
10
24.5
15
5
35.13
10
24.5
2
175.88
Team 6
49.875
10
22.88
15
5
33.88
9.75
24
5
175.385
Team 3
49.75
10
24.38
15
5
32.95
9.75
24.5
3
174.33
Team 4
49.75
9.625
24.88
15
5
32
10
24
2
172.255
Team 8
50
10
24.25
15
5
26.63
8.5
24
5
168.38
Team 12
49.75
10
23.5
15
5
27.5
10
20.5
4
165.25
Team 9
39.75
9.5
24.38
15
5
33.63
10
25
2
164.26
Team 11
49
9.75
24.5
15
5
23.88
10
22.3
2
161.43
Team 2
44.875
17.88
12
0
32.33
9.75
23
0
139.835
Our team rank is 9th currently.
If we get A in class, I heard that we have to in rank 5th at least.
It is not absolute right, but it was average.
What we can do is making appointment with TA or Grade to check the reason of deduction.
In addition, we should ask TA before submit your report definitely.
It would be helpful you and team to reduce efforts to finish report.
Kimberly, please check who has how many bugs still have.
Thanks.
I check the Team-Homework witch due is on next Monday.
This is Exit Criteria.
I think we can finished all parts except QMP.
Therefore, we can do update each report instead of putting new ideas into report.
I will update more specific plan soon.
Please check schedule for each member
For your convenience, I used (product) which means report or something we have to do for class.
focusing on that kind of sign to figure out what your job is.
Thanks.
Please check schedule for each members.
It looks not confertable, and JUST FOCUS ON the schedule and tasks BETWEEN TODAY(9/22) and 10/7.
I change all of schedule based on class web schedule again.
Please FUCUS ON ONLY Reports what you are allocated.
Thanks.
Please check schedule for each members.
It looks not confertable, and JUST FOCUS ON the schedule and tasks BETWEEN TODAY(9/22) and 10/3.
I will update tasks and schedules later for period which is after 10/4.
Please FUCUS ON ONLY Reports what you are allocated.
Thanks.
FYI:
Now, I have upload the first version of the FED(Feasibility Evidence Description).
All of you can modefy the doucuments if you have any idea.
And the section 5 Risk assessment is the only section that I have to have in on Firday.
So please focus on the section 5 and if you have any idea to improve the other sections just leave it on the document.
- Zhen Huang( freedomcold). SEP.22
In addition, we are using the rule for representing VERSION of FILE.
Version is represented two digits. First digit refer the phase; 1 : exploration phase, 2: valudation phase, and 3: foundation phase.
Second digit refers the number of updating.
For example, version 1.4 means that this file is for exploration phase, and four times updated.
-Teawon Han. SEP.22
FYI :
Now, we are working for CLIENT INTERACTION REPORT.
This report will be used to discuss with client next week.
To access this report, you can click 'Client Interaction Report' (left-bottom side).
In addition, I will finish building webpage as soon as possible.
After that, I will let you all know how to access there.
-Teawon Han. SEP.18
Member's Role in Project
- Prototyper, and Requirements Engineer now.
Teawon Han : Project Manager
Zhen Huang : Feasibility Analyst
Ziming Wei : Operational Concept Engineer
Kimberly Krause : IIV&V, Systems Requirements Engineer
Xiaoli Ma : Lifecycle Planner
Ian Williams : Requirement Engineer
Welcome to the LEMA School Integrated Family Accountability System Project Wiki.
Team grade information.If we get A in class, I heard that we have to in rank 5th at least.
It is not absolute right, but it was average.
What we can do is making appointment with TA or Grade to check the reason of deduction.
In addition, we should ask TA before submit your report definitely.
It would be helpful you and team to reduce efforts to finish report.
Kimberly, please check who has how many bugs still have.
Thanks.
I check the Team-Homework witch due is on next Monday.
This is Exit Criteria.
I think we can finished all parts except QMP.
Therefore, we can do update each report instead of putting new ideas into report.
I will update more specific plan soon.
Please check schedule for each member
For your convenience, I used (product) which means report or something we have to do for class.
focusing on that kind of sign to figure out what your job is.
Thanks.
Please check schedule for each members.
It looks not confertable, and JUST FOCUS ON the schedule and tasks BETWEEN TODAY(9/22) and 10/7.
I change all of schedule based on class web schedule again.
Please FUCUS ON ONLY Reports what you are allocated.
Thanks.
Please check schedule for each members.
It looks not confertable, and JUST FOCUS ON the schedule and tasks BETWEEN TODAY(9/22) and 10/3.
I will update tasks and schedules later for period which is after 10/4.
Please FUCUS ON ONLY Reports what you are allocated.
Thanks.
FYI:
Now, I have upload the first version of the FED(Feasibility Evidence Description).
All of you can modefy the doucuments if you have any idea.
And the section 5 Risk assessment is the only section that I have to have in on Firday.
So please focus on the section 5 and if you have any idea to improve the other sections just leave it on the document.
- Zhen Huang( freedomcold). SEP.22
In addition, we are using the rule for representing VERSION of FILE.
Version is represented two digits. First digit refer the phase; 1 : exploration phase, 2: valudation phase, and 3: foundation phase.
Second digit refers the number of updating.
For example, version 1.4 means that this file is for exploration phase, and four times updated.
-Teawon Han. SEP.22
FYI :
Now, we are working for CLIENT INTERACTION REPORT.
This report will be used to discuss with client next week.
To access this report, you can click 'Client Interaction Report' (left-bottom side).
In addition, I will finish building webpage as soon as possible.
After that, I will let you all know how to access there.
-Teawon Han. SEP.18
Member's Role in Project
- Prototyper, and Requirements Engineer now.
Teawon Han : Project Manager
Zhen Huang : Feasibility Analyst
Ziming Wei : Operational Concept Engineer
Kimberly Krause : IIV&V, Systems Requirements Engineer
Xiaoli Ma : Lifecycle Planner
Ian Williams : Requirement Engineer
-Teawon Han. SEP. 0